Working away from home.
We went to visit Cindy's mom and did some more work on her house. One of the projects was this spiral deck staircase. It gives her a shortcut from the car to the house without having to use the long ramp.
We've been saying our life is an adventure for quite some time now ... so I figured that we would share it with y'all.
Penned by
Maël
at
16:52
2
comments
Labels: remodeling
Penned by
Maël
at
20:06
2
comments
Labels: house, remodeling

Penned by
Maël
at
22:52
0
comments
Labels: christian walk, house, remodeling
With the strong possibility of our moving to Texas in the summer to pursue another PhD, this time in Theology and at Southwestern Baptist Theological Seminary, some have wondered how much we still lack to do on our house. The answer is quite a lot!
The house we bought was a foreclosed home which had been empty for over a year before we bought it. The siding and several windows were rotting. The front porch had some rotting issues also. The roof, sump pump, and the air conditioner needed replacing. The fascia boards were rotten. Inside, the carpet was filthy and damaged. The kitchen floor turned out to be rotten down to the sub floor. The bathrooms were nasty. Most light fixtures had been taken /stolen by the previous owners. Most appliances had been removed. All in all ... it was a big mess.
Since then, the roof, the sump pump, and the AC unit have all been replaced (these are the only things we actually contracted out). About 60% of the siding has been replaced. Most (but not quite all) of the rotting issues with windows and fascia boards have been dealt with. As for the inside, one of the two full bathrooms and the half bath have been re-floored and are done, with the exception of some trim work. The master bath is still completely gutted - you can still see some studs. The kitchen floor has been tiled, the living room floor has been replaced with hardwood floors. Most of the upstairs hall and part of one of the three bedrooms have also been floored with hardwood floors. Most of the walls have been repaired and painted. The kitchen cabinets are in the process of being refinished. All the molding was very abused, so Cindy is repairing all of it and painting it white since we removed it to install the floors. The fireplace has been re-done.
What is still missing? The master bathroom needs to be put back together: floor, bathtub, sink, toilet, etc. The bedrooms need to be floored and their molding needs to be repaired, painted, and installed. The dining room (my tool shop) needs to be floored and have some sheet rock work done. We have a french door to install in the kitchen and the cabinets need to be finished. The counter top also needs to be finished. We have to floor the steps and finish its surrounding molding. 40% of the siding needs to be installed and the whole outside needs to be painted. We still have to build the porch for the kitchen french doors to open out to, and the deck needs to be repaired. The front porch still needs attention, as the posts are bad. We added the structure for a pergola on the deck outside the dining room french doors to provide structural support for an overhang over that door; now we have to finish it. Plus, many other little details need to be figured out and taken care of.
There. Now you know how you can pray for us or help us, if you are handy and want to do some construction.
Penned by
Maël
at
17:21
1 comments
Labels: house, remodeling
Penned by
Maël
at
22:19
2
comments
Labels: house, remodeling

The new surround is all homemade, including the fluting and slate inserts. It was an interesting project that required me to learn some new wood working techniques. I am indebted to Bink for his tips on Making Grooves in Wood where I leanerd how to cut nice fluting and to This Old House for thier Easy Mantel Makeover where I got very useful tips on how to tile a fireplace surround with slate. More than these, I need to thank my neighbor, Don, because without his planer, I could not have achieved this look, and Jackie at Sherwin Williams, for his superb stain matching skills which allowed us to match the new woodwork with the original mantel stain color.
Penned by
Maël
at
21:41
9
comments
Labels: house, remodeling
Penned by
Maël
at
22:38
0
comments
Labels: general, house, remodeling
Well it took a while, but the living room's wood floor is finally finished. This week we put in the final corner, finished the border that goes around the room, and set it up so that when we are ready, we can start flooring the dining room. Next flooring project: the upstairs hall and the steps.
Penned by
Maël
at
23:12
1 comments
Labels: house, remodeling
So we left our renovation site (home) for our Christmas break and went down to Georgia. Obviously, though, construction is now in our blood. What did we do for most of our break? Yes, you guessed it, we built stuff. Cindy's mom was in definite need of shelves for her collection of books. They were all so improperly stored in many cardboard boxes. So with the very generous loan of tools from extended local family and lots of work, the books are now properly displayed and stored on her new bookcase, featuring 20 fixed shelves and 15 adjustable shelves, in her new reading room. We did not have time to do the finishing touches, so we will have to go down to add molding and to paint the adjustable shelves. For the meantime, though, we rest content that the books have a proper resting place.
Penned by
Maël
at
22:51
5
comments
Labels: family, remodeling
the original siding with rotten fascia boards (07/18/06)
close up of the porch with our new light, old everything else (11/02/06)
new second story, old first story (01/18/07)
siding and new fascia boards on the second story, new siding to the right of the front door. Old siding being ripped off where you see black to the left of the door. (06/14/07)
more siding has been removed where you see black (06/16/07)
all the old siding has been removed from the front and more new siding is going up (06/19/07)
more new siding is up to the left of the door (06/19/07)
look at all that new siding! (06/20/07) compare to ->
Penned by
Maël
at
21:33
0
comments
Labels: house, remodeling
As most of you can tell, I have not written in almost a month. I have two series that are not yet finished, and I would love to spend some time finishing them, but I have been busily working on the house.
Hopefully, I will find some time in the near future to post some, but in the meantime, I am in blog-bernation (both writing and reading blogs).
Penned by
Maël
at
07:03
0
comments
Labels: general, house, remodeling
Just a word of encouragement to y'all tiling out there. Grout really makes a difference. You might look at your pre-grout work and even be slightly disappointed, but once the grout goes down ... wow, what a difference. I furnished the three pictures above to make my point. BTW - we are almost finished with the kitchen floor. Praise God!
Another tip: since we could not go without using the kitchen, I grouted the inside and I will grout the outside on Friday, that way there was always a part of the kitchen that we could walk on.
Penned by
Maël
at
00:15
0
comments
Labels: house, remodeling
So I started to do some before and after pictures of our progress.
Here you see the guest bathroom (the only functioning bathroom in the house). We tiled the floor (it used to be linoleum), painted the walls, painted the vanity, and changed the countertop, sink, and faucets. We are still in the process of painting the molding and the vanity doors. We look forward to my having time in January to make our mirror frame so we can finally have a mirror in this bathroom.
Here you see the progress on one of our guest bedrooms. This room required a lot of attention to the walls, new shelves in the closet, and the addition of the fan/light. Since the last picture, the junk is gone, the closet shelves are installed, the bed has been set up so Mama (Cindy's mom could stay there during Thanksgiving), and I started on the wood floors.
Penned by
Maël
at
11:47
0
comments
Labels: house, remodeling