Progress on the front of the house
the original siding with rotten fascia boards (07/18/06)
close up of the porch with our new light, old everything else (11/02/06)
new second story, old first story (01/18/07)
siding and new fascia boards on the second story, new siding to the right of the front door. Old siding being ripped off where you see black to the left of the door. (06/14/07)
more siding has been removed where you see black (06/16/07)
all the old siding has been removed from the front and more new siding is going up (06/19/07)
more new siding is up to the left of the door (06/19/07)
look at all that new siding! (06/20/07) compare to ->